Delhi Airport to have air trains
Advertisement
Advertisement
Advertisement
Delhi’s From 2020, T2, which is the old international airport would be a brand new terminal T 4 and would share the load of traffic. This initiative of air train was supposed to be started in 2020 along with the new terminal. However with the volume of traffic at
"By our estimates, the line should be 5.5-km-long with 3km underground section and 2.5km on ground. The average costing of each kilometre of under and on ground Metro line is up to Rs 500 crore and Rs 200 crore. It should cost Rs 1,500-2,000 crore. All this will be known for sure once DMRC gives its report to DIAL,” a source told the Economic Times.
Advertisement
- I spent $2,000 for 7 nights in a 179-square-foot room on one of the world's largest cruise ships. Take a look inside my cabin.
- Saudi Arabia wants China to help fund its struggling $500 billion Neom megaproject. Investors may not be too excited.
- Colon cancer rates are rising in young people. If you have two symptoms you should get a colonoscopy, a GI oncologist says.
- Experts warn of rising temperatures in Bengaluru as Phase 2 of Lok Sabha elections draws near
- Axis Bank posts net profit of ₹7,129 cr in March quarter
- 7 Best tourist places to visit in Rishikesh in 2024
- From underdog to Bill Gates-sponsored superfood: Have millets finally managed to make a comeback?
- 7 Things to do on your next trip to Rishikesh