Delhi-Varanasi bullet train work expedited, thanks to upcoming UP polls
Advertisement
In run up to Uttar Pradesh polls in 2017, work on Delhi-Varanasi bullet train has been accelerated and it might just take two hours 40 minutes to cover a distance of 782 kilometres.
This is a part of PM Narendra Modi’s strategy to depict a pro-development image in UP as the holy city of Varanasi is also his constituency.
Meanwhile, the Delhi-Varanasi bullet train will pass through Aligarh, Agra, Kanpur, Lucknow and Sultanpur.
A Spanish firm is conducting feasibility study of the high-speed rail corridor and is expected to submit its final report in November.
Meanwhile, the project will be built at a tune of Rs 43,000 crore.
However, an official told TOI the final cost will be worked out only after detailed field study of the finally chosen alignment. The possibility of operating double-decker high speed trains on this section is also being explored by the consultant.
Advertisement
This is a part of PM Narendra Modi’s strategy to depict a pro-development image in UP as the holy city of Varanasi is also his constituency.
Meanwhile, the Delhi-Varanasi bullet train will pass through Aligarh, Agra, Kanpur, Lucknow and Sultanpur.
A Spanish firm is conducting feasibility study of the high-speed rail corridor and is expected to submit its final report in November.
Meanwhile, the project will be built at a tune of Rs 43,000 crore.
However, an official told TOI the final cost will be worked out only after detailed field study of the finally chosen alignment. The possibility of operating double-decker high speed trains on this section is also being explored by the consultant.
Advertisement
Advertisement
- Poonch Terrorist Attack: One Indian Air Force soldier dies, five injured; Patrolling intensifies across J&K
- The Role of AI in Journalism
- 10 incredible Indian destinations for family summer holidays in 2024
- 7 scenic Indian villages perfect for May escapes
- Paneer snacks you can prepare in 30 minutes
- Nothing Phone (2a) blue edition launched
- JNK India IPO allotment date
- JioCinema New Plans
- Realme Narzo 70 Launched
- Apple Let Loose event
- Elon Musk Apology
- RIL cash flows
- Charlie Munger
- Feedbank IPO allotment
- Tata IPO allotment
- Most generous retirement plans
- Broadcom lays off
- Cibil Score vs Cibil Report
- Birla and Bajaj in top Richest
- Nestle Sept 2023 report
- India Equity Market