+

Cookies on the Business Insider India website

Business Insider India has updated its Privacy and Cookie policy. We use cookies to ensure that we give you the better experience on our website. If you continue without changing your settings, we\'ll assume that you are happy to receive all cookies on the Business Insider India website. However, you can change your cookie setting at any time by clicking on our Cookie Policy at any time. You can also see our Privacy Policy.

Close
HomeQuizzoneWhatsappShare Flash Reads
 

Boston University is building an enormous new building that looks like a Jenga tower and uses no fossil fuels

Feb 19, 2020, 20:57 IST
KPMB ArchitectsBoston University new building.
  • Boston University is adding an environmentally sustainable building to its campus.
  • The building, which is set to be finished in 2022, will not use any fossil fuels.
  • The Center for Computing and Data Science will be the largest building on campus and incorporate energy-saving technology.
  • Visit Business Insider's homepage for more stories.

Boston University is taking a major step towards sustainability with its 19-story, 350,000 square-foot building planning to be finished in 2022. The building, which will be the tallest on BU's campus, will combine the math, statistics, and computer science departments.

Complimentary Tech Event
Transform talent with learning that works
Capability development is critical for businesses who want to push the envelope of innovation.Discover how business leaders are strategizing around building talent capabilities and empowering employee transformation.Know More

Plans for the building are in line with the university's climate action plan, which was approved in 2017. The plan revolves around eliminating carbon emissions totally be 2040, estimated to cost $141 million, based on the city's suggestions for rising sea levels. The building was designed by KPMB Architects.

Check out the renderings here.

Advertisement

The 19-story building will stand five feet above the recommendation from the city of Boston based on forecasts of sea-level rise, protecting it from flooding of the nearby Charles River.

Source: City of Boston

BU says the building will be the school's largest and the most energy-efficient building when it's finished in 2022.

The building will be a "vertical campus," with highly-trafficked labs and classrooms on lower floors, department rooms on upper floors, and social gathering spaces on the roof.

The building will be totally free of fossil fuels and incorporate energy-saving tech.

Energy for the building will come from geothermal wells, and no gas pipes will be connected to it.

Special, triple-glazed windows will manage interior temperatures to reduce energy use.

Designers incorporated details like shading systems designed to reduce glare on computer screens.

The design isn't only focused on environmental concerns. As an academic building, some rooms will feature whiteboard walls that foster learning and collaboration.

Boston University is located in downtown Boston, so the design also incorporates the city itself.

The design includes sheltered pathways from harsh Boston weather, along with green spaces.

They will connect historic Brownstones to other buildings on campus.

Here's what the building will look like on Boston's skyline, along the Charles River.

Next Article